Thuringia
Renovated indoor pool opened in Dingelstädt
Published September 8, 2026

The bathroom has a new stainless steel basin with five lanes and adjustable water depth. In addition, the insulation was renewed and a photovoltaic system was installed on the roof. The conversion cost 6.3 million euros.
Source: Thüringen | Nachrichten und aktuelle Informationen